{"id":12107,"date":"2023-05-23T00:00:00","date_gmt":"2023-05-23T00:00:00","guid":{"rendered":"https:\/\/adn.monetizemail.com\/?p=12107"},"modified":"2023-05-24T06:50:42","modified_gmt":"2023-05-24T06:50:42","slug":"eygelshoven-army-depot-celebrates-rail-reopening","status":"publish","type":"post","link":"https:\/\/adn.monetizemail.com\/?p=12107","title":{"rendered":"Eygelshoven Army Depot celebrates rail reopening"},"content":{"rendered":"<div class=\"editor-image single\">\n<figure class=\"photo cur-photo\">\n          <span class=\"centered-image\"><br \/>\n            <span class=\"img-container\"><br \/>\n              <a class=\"rich-text-img-link\" href=\"https:\/\/api.army.mil\/e2\/c\/images\/2023\/05\/23\/9f20514a\/original.jpg\" target=\"_blank\"><\/p>\n<p>              <\/a><br \/>\n                          <\/span><br \/>\n          <\/span><figcaption>\n                        <span class=\"image-caption\"><br \/>\n              <span class=\"caption-text\"><br \/>\n                Leadership from U.S. Army Garrison Benelux and local mission partners prepare to cut a ribbon during a ceremony marking the reopening of the rail line at Eygelshoven Army Depot, the Netherlands, May 19, 2023. During the ceremony, speakers highlighted the additional logistics capabilities and strategic flexibility available with the addition of a functional rail line at the site.  (U.S. Army photo by Meredith Mulvihill, USAG Benelux Public Affairs)<br \/>\n                <span class=\"caption-author\"> (Photo Credit: U.S. Army)<\/span><br \/>\n              <\/span><br \/>\n              <a href=\"https:\/\/api.army.mil\/e2\/c\/images\/2023\/05\/23\/9f20514a\/original.jpg\" title=\"View original\" target=\"_blank\">VIEW ORIGINAL<\/a><br \/>\n            <\/span><br \/>\n          <\/figcaption><\/figure>\n<\/p><\/div>\n<p>EYGELSHOVEN ARMY DEPOT, Netherlands \u2013 After five years of being out of commission, the Eygelshoven Army Depot rail line is now back to full operations.<\/p>\n<p>U. S. Army Garrison Benelux Commander Col. Lindsay Matthews celebrated the momentous occasion alongside local installation staff and mission partners with a ribbon cutting ceremony May 19.<\/p>\n<p>\u201cThis is a big win,\u201d said Erica Nowells, Eygelshoven Army Prepositioned Stock-2 (APS-2) site manager. \u201cNow we have multiple ways of supporting [Army Field Support Battalion-Benelux (AFSBn-Benelux)] with their mission throughout Europe.\u201d<\/p>\n<p>The U.S. Army acquired the Eygelshoven Army Depot in 2016, turning it into an APS-2 site and the headquarters for the AFSBn-Benelux.<\/p>\n<p>From the very start, the 65-year-old rail line previously used to transport heavy equipment was deemed unfit for use.<\/p>\n<p>\u201cRail is so important in Europe,\u201d said Dwayne Key, USAG Benelux-Brunssum deputy garrison manager. \u201cOnly three [APS-2] sites actually have rail, so the ability to deliver this type of infrastructure to the 405th [Army Field Support Brigade] and the Army is really significant. Making sure our tenant\u2019s mission is always protected and ready to execute \u2013 that&#8217;s what we\u2019re here to do.\u201d<\/p>\n<p>However, before work could begin on renovating the rail many steps had to be taken to prepare for the project.<\/p>\n<div class=\"editor-image single\">\n<figure class=\"photo cur-photo\">\n          <span class=\"centered-image\"><br \/>\n            <span class=\"img-container\"><br \/>\n              <a class=\"rich-text-img-link\" href=\"https:\/\/api.army.mil\/e2\/c\/images\/2023\/05\/23\/aa8ccb98\/original.jpg\" target=\"_blank\"><br \/>\n                <img decoding=\"async\" alt=\"Eygelshoven Army Depot celebrates rail reopening\" src=\"https:\/\/adn.monetizemail.com\/wp-content\/uploads\/2023\/05\/size0-full-412.jpg\" \/><br \/>\n              <\/a><br \/>\n                          <\/span><br \/>\n          <\/span><figcaption>\n                        <span class=\"image-caption\"><br \/>\n              <span class=\"caption-text\"><br \/>\n                Inspectors review the rail line at Eygelshoven Army Depot, the Netherlands, March 27, 2023. After years of hard work, U.S. Army Garrison Benelux and local mission partners celebrated the reopening of the site\u2019s rail line with a ribbon cutting ceremony on May 19. (U.S. Army photo by Sandra Wilson, USAG Benelux Public Affairs)<br \/>\n                <span class=\"caption-author\"> (Photo Credit: U.S. Army)<\/span><br \/>\n              <\/span><br \/>\n              <a href=\"https:\/\/api.army.mil\/e2\/c\/images\/2023\/05\/23\/aa8ccb98\/original.jpg\" title=\"View original\" target=\"_blank\">VIEW ORIGINAL<\/a><br \/>\n            <\/span><br \/>\n          <\/figcaption><\/figure>\n<\/p><\/div>\n<p>Due to Eygelshoven residing in the Natura 2000 protected nature area of the European Union, ecologists had to carefully gather and relocate endangered species over the course of many months near the potential worksite.<\/p>\n<p>Additionally, the rail line crossed over privately-owned properties, requiring additional coordination with the landowners before construction could begin.<\/p>\n<p>After years of prep, work on the rail line started in late 2022 with the help of a local Dutch rail construction company.<\/p>\n<p>\u201cThat was a turning point that started to change things to feel more encouraging\u2014when you start to feel that this is actually working [and] will actually be successful,\u201d said Jill Wandoloski, general engineer for Benelux Directorate of Public Works and contracting officer representative for the rail project.<\/p>\n<p>Construction on the rail line progressed quickly, with the company replacing each layer of the track. New sand was brought in, and the previously unstable smooth rock bed (ballast) was replaced with sturdier angled rocks. Special weather and insect resistant wood was sourced for the replacement rail crossties since the protected nature area restricted use of chemical treatments, such as creosote.<\/p>\n<p>\u201cWood was the best option, so we special ordered Azob\u00e9 wood from Africa,\u201d said Wandoloski. \u201cIt is naturally a hard wood\u2014it doesn\u2019t require any special treatment.\u201d<\/p>\n<p>French drains were also installed on either side of the track to collect water run-off.<\/p>\n<p>\u201cWe were really concerned with run-off of water. Water is always a problem,\u201d said Wandoloski. \u201c[For this reason] normally the rail is the highest part of the land.\u201d<\/p>\n<p>This wasn\u2019t the case for the Eygelshoven rail line since some of the private property had been built up around it, potentially leading to watershed onto the track. The French drains provided a solution for this problem.<\/p>\n<p>The construction company finished the project within the predicted timeline, working in adverse weather conditions at times. Additionally, they gave credit back to the Army since the original rails were in solid condition and able to be reused.<\/p>\n<p>\u201cWe came in on schedule and under budget which never happens in construction,\u201d said Wandoloski. She said she feels that 50 more years of rail line use was money well-spent.<\/p>\n<p>Lt. Col. Stephen Blake Smith, AFSBn-Benelux commander, agreed. \u201cThe rail line improvement at Eygelshoven&#8230;provides Army leaders and planners even more flexibility and options for our strategic theater plans.\u201d<\/p>\n<p>He explained that adding rail transport to the sites pre-existing transportation options would allow AFSBn-Benelux to support requests throughout the European theater even more effectively and praised the strong host nation partnership that helped make the project a reality.<\/p>\n<p>\u201cWe look forward to showcasing this renewed capability in future theater support operations, and believe it is yet another highlight of the strong U.S.-Dutch relationship on display at Eygelshoven,\u201d he said. \u201cOur people are the true difference makers and will ensure we remain ready to execute our important mission.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Leadership from U.S. Army Garrison Benelux and local mission partners prepare to cut a ribbon during a ceremony marking the reopening of the rail line at Eygelshoven Army Depot, the Netherlands, May 19, 2023. During the ceremony, speakers highlighted the additional logistics capabilities and strategic flexibility available with the addition of a functional rail line [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":12109,"comment_status":"close","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=\/wp\/v2\/posts\/12107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12107"}],"version-history":[{"count":3,"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=\/wp\/v2\/posts\/12107\/revisions"}],"predecessor-version":[{"id":12112,"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=\/wp\/v2\/posts\/12107\/revisions\/12112"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=\/wp\/v2\/media\/12109"}],"wp:attachment":[{"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/adn.monetizemail.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}